PM A (Preventive Maintenance Level A) is the most frequent tier in a multi-level maintenance program. Performed every 250-500 operating hours, PM A focuses on basic service tasks that keep equipment running smoothly between more comprehensive services. This guide provides a complete PM A checklist specifically designed for forklifts and similar industrial equipment.
PM A is typically performed every 250-500 hours or quarterly, whichever comes first. Severe operating conditions may require shorter intervals. Always follow manufacturer recommendations for your specific equipment.
What is PM A Service?
PM A represents the first level in a tiered preventive maintenance system. The "A" designation indicates basic, frequent service items that need attention at every maintenance interval. PM A focuses on fluids, filters, and visual inspections rather than the deep component work found in PM B, C, and D levels.
Think of PM A as your equipment's regular check-up. Just as you change your car's oil regularly without replacing the transmission, PM A handles routine maintenance without addressing items that wear more slowly.
PM A Service Interval
- Standard interval: Every 250-500 operating hours
- Calendar-based: Quarterly (every 3 months)
- Use whichever comes first
- Severe duty: Reduce interval by 25-50%
- Light duty: May extend to 500-600 hours maximum
PM A Quick Reference Summary
Use this quick reference to plan your PM A service. Estimated times are for experienced technicians; allow 25% more time for less experienced personnel.
- Engine oil change (IC): 15-20 minutes, use manufacturer-specified oil weight (typically SAE 10W-30)
- Oil filter replacement: 5-10 minutes, torque to 12-15 ft-lbs or hand-tight plus 3/4 turn
- Air filter inspection: 5 minutes, replace if >25% restricted
- Hydraulic fluid check: 5 minutes, fill to sight glass mark
- Battery terminals: 10 minutes, torque to 5-8 ft-lbs for lead-acid
- Lug nuts check: 10 minutes, torque to manufacturer spec (typically 70-100 ft-lbs)
- Lift chain tension: 10 minutes, 1/4 to 1/2 inch deflection at mid-span
- Brake test: 5 minutes, verify stopping within rated distance
- Total PM A time: 90-120 minutes for IC forklifts, 60-90 minutes for electric
Complete PM A Checklist
The following checklist covers every PM A service item organized by system. Check off each item as completed and note any defects requiring follow-up.
Engine/Motor Service
- Change engine oil (IC forklifts) or check motor brushes (electric)
- Replace engine oil filter (IC forklifts)
- Check/top off coolant level and condition (IC forklifts)
- Inspect air filter element, replace if dirty
- Check belt tension and condition
- Inspect fuel filter, replace if due
- Check for oil or coolant leaks
- Verify all fluid levels within specification
Hydraulic System
- Check hydraulic fluid level
- Inspect hydraulic filter, replace if due
- Check for hydraulic leaks at hoses and cylinders
- Verify lift and tilt operation
- Inspect hydraulic hoses for wear or damage
- Check cylinder rod condition
- Test load holding capability
Transmission and Drive
- Check transmission fluid level
- Inspect for transmission leaks
- Check drive axle oil level
- Inspect drive chain tension and lubrication
- Verify forward and reverse operation
- Check inching pedal operation
- Listen for unusual noises during operation
Brakes
- Test service brake operation
- Check parking brake holding capability
- Inspect brake fluid level (if applicable)
- Check brake pedal travel
- Listen for unusual brake noises
- Verify brake warning light operation
Steering
- Check power steering fluid level
- Inspect steering linkage
- Test steering response and effort
- Check for steering play or looseness
- Verify steering stops are intact
Electrical System
- Test all lights (headlights, tail lights, warning lights)
- Check horn operation
- Verify backup alarm functions
- Inspect battery connections and terminals
- Check battery electrolyte level (flooded batteries)
- Clean battery top and terminals
- Test gauges and warning indicators
- Inspect wiring for damage or wear
Mast and Forks
- Inspect forks for cracks or wear
- Check fork heel thickness (minimum 90% of blade)
- Measure fork tip wear
- Inspect mast channels and rollers
- Lubricate mast rails
- Check lift chain condition and tension
- Inspect load backrest
- Verify capacity plate is readable
Tires and Wheels
- Check tire condition and wear
- Inspect for chunking, cuts, or embedded debris
- Verify lug nuts are tight
- Check wheel condition
- Measure tread depth if applicable
- Rotate tires if recommended
Safety Equipment
- Test seat belt operation
- Verify overhead guard integrity
- Check fire extinguisher charge and date
- Inspect safety labels and warnings
- Test all safety interlocks
- Verify mirror condition if equipped
PM A vs PM B: What is the Difference?
PM A covers basic items performed at every service interval. PM B includes everything in PM A plus additional items that do not require attention as frequently:
- PM A: Oil change, filter replacement, fluid checks, visual inspections
- PM B: All PM A items plus brake adjustment, detailed hydraulic checks, electrical system testing
- PM B is typically performed every 2nd or 3rd PM A interval
- PM B takes longer and costs more due to additional labor and parts
Tools Required for PM A
- Basic hand tools (wrenches, sockets, screwdrivers)
- Oil drain pan and funnel
- Filter wrenches
- Grease gun
- Multimeter for electrical testing
- Tire pressure gauge (pneumatic tires)
- Flashlight for visual inspections
- Fluid sampling equipment (optional for analysis)
Documentation Requirements
Proper documentation of PM A service is essential for compliance, warranty, and fleet management:
- Record date, hour meter reading, and technician
- Document all fluids added or replaced
- Note filter part numbers used
- Record any defects or concerns found
- Document follow-up items for future service
- Keep records accessible for audits
- Track costs for maintenance budgeting
Common PM A Mistakes to Avoid
- Skipping service due to production demands
- Using incorrect fluids or filter specifications
- Not recording hour meter reading
- Ignoring minor issues that could become major
- Failing to road test after service
- Not documenting work performed
- Extending intervals beyond manufacturer limits
Frequently Asked Questions
How long does PM A take?
A typical PM A service takes 1-2 hours depending on the forklift type and technician experience. Electric forklifts are generally faster than IC forklifts since there is no oil change required.
Can operators perform PM A?
Some organizations train operators to perform basic PM A tasks like fluid checks and filter changes. However, many items require a qualified maintenance technician. Check your local regulations and company policies.
What happens if I skip PM A?
Skipping PM A leads to accelerated wear, unexpected breakdowns, higher repair costs, and potential safety hazards. It may also void manufacturer warranties and create compliance issues for OSHA audits.
Conclusion
PM A service is the foundation of your preventive maintenance program. By consistently performing these basic maintenance tasks, you prevent costly breakdowns, extend equipment life, and maintain a safe working environment. Use this checklist as a starting point and customize it for your specific equipment and operating conditions.